| Year of construction: | 2001/2002 |
| Client: | City of Munich, Civil Engineering Inspectorate |
Architects: | Auer + Weber, Munich |
Structural Design: | Büro Mayr + Ludescher |
Proof + Test Engineering: | Technical University of Munich, Div. Steel Construction (Professor Bucak) MPA Braunschweig (Dr. Wesche) Delta-X GmbH (Dr. Burmeister) |
Glass statics: | GSK Glas-Statik-Konstruktion GmbH, Haltern |
Execution: | Loharens Ing. Bau GmbH |
Glass: | VETROFLAM® - Special combination dimension 1700 x 2000 mm |
gebo-product: | point-fitting type Vetropoint® HAK 80 optimized version for fire-protection glazingideal articulated plated fitting |
Requirements to the point fitted hanging over-head glazing sub-construction: | |
Fire protection requirements: | minimum of 30 minutes fire resistancy; without a sudden drop of glass parts for at least 30 minutes |
| Aerodynamic forces, such as wind force and traffic Snow loads Hail Dynamic impacts Vandalism Suicide attempts Accessibility for cleaning purposes |
For detailed information contact us now | |
